Design Time The Army Corps of Engineers and the National Geospatial-Intelligence Agency reveal concept renderings for the Next NGA West (N2W) campus from the design-build team McCarthy HITT's winning proposal, April 9, 2019. The entire campus is expected to be operational in 2025. SHARE: Download: Full Size (0.41 MB) Credit: James Lowe VIRIN: 190409-A-YB451-0002M.JPG Photo Gallery